Promet was responsible for the development of detailed engineering for Zaldivar Mining Camp, defining the project’s final aspects and optimizing the current layout. Three construction options presented for evaluation as part of the business strategy once the engineering stage ended.

Volumes: 3.750 HH – 7.995 M2
Location: 175 km al sureste de la ciudad de Antofagasta, II Región.