- Client: Transelec
- Date: 17/10/2016
- Scope:
EPC type contract for an autotransformer bank (230/161/6g kV- 300 MVA) for the reserve unit of the Tinguiririca electrical substation, composed of the following works:
- – Incorporation of the Autotransformer Bank for the reserve unit, Hyundai brand, to the 220 kV transformer panel
- – Connection to the 154 kV transformer panel
- – Movement of high tension lines 220kV
- – Construction and assembly of a double circuit line 2x 154kV
- – Control system and protections for operation
- – Testing and commissioning of all works
Volumes: 119.379 HH
Location: Valle del Tinguiririca, VI Región, Chile.
Ver proyecto en 360º