Project consists of the construction & assembly of the Mine surface and subterranean installations (Industrial zone on the surface, and in mine interior) via EPC modality. Includes stages of: detailed engineering, construction/assembly, and commissioning. This contract was done thanks to the synergy and know-how of two of our business units, Modular E+C and Industrial Construction and Assembly, as the ‘Cafeteria-Refuge Industrial Grinder- BICH’ project was completed. Thanks to this, our Mine Infrastructure proposal provides shelter for a range of 400-1.200 people at its peak, with main areas such as a cafeteria, offices, control rooms, and workshops, among others; both within the mine’s interior and on the surface.
Volumes: 473.438 HH
Location: II Región, Antofagasta