This project consists of the construction and assembly of the mining surface and underground infrastructure (Industrial sector for the surface and mine interior) with an EPC modality, including stages of: detailed engineering, construction/assembly, and commissioning. This contract was completed thanks to the synergy and know-how of our Modular E+C and Industrial Construction business units, which allowed us to complete the “Dining-Refuge Industrial Crushing-BICH Area” project. Thanks to this, our Mine Infrastructure proposal can host from a minimum of 400 people to a peak of 1,200, with main areas such as dining area, offices, control rooms, and workshops, among others; developed in the mine’s interior as well as on the surface.

Volumes: 473.438 HH
Location: II Región, Antofagasta