The contract was awarded to a consortium of Promet/Technofast for construction for 4 camps for the Quebrada Blanca project Phase 2. This included: supply, construction & assembly and rental of camp dormitory buildings and auxiliary buildings, as well as urbanization works for sanitation and electrical, water treatment plant, supply and installation of tanks
Volumes: 1.256.772 HH – 99.4614
Location: Aprox, a 165 km al sureste de Iquique, I Región Tarapacá.
Our company executed this EPC contract from the engineering, supply, construction, assembly, to testing and all construction activities for the Chacay II Camp, which has a 1.550 person capacity. Project scope includes:
Volumes: 20.485 m2 | 574.599 HH
Location: IV Región, 45 km de Salamanca
This project consists of the construction and assembly of the mining surface and underground infrastructure (Industrial sector for the surface and mine interior) with an EPC modality, including stages of: detailed engineering, construction/assembly, and commissioning. This contract was completed thanks to the synergy and know-how of our Modular E+C and Industrial Construction business units, which allowed us to complete the “Dining-Refuge Industrial Crushing-BICH Area” project. Thanks to this, our Mine Infrastructure proposal can host from a minimum of 400 people to a peak of 1,200, with main areas such as dining area, offices, control rooms, and workshops, among others; developed in the mine’s interior as well as on the surface.
Volumes: 473.438 HH
Location: II Región, Antofagasta
This EPC project consists of the development of design, architecture, detailed engineering, construction and assembly services for the project called “Supply, Construction, and Construction for DGM Camp Operations”, composed of dormitory buildings, as well as the complementary infrastructure for recreation and parking areas for personal transport.
Volumes: 78.533 HH
Location: 120 km al sur de Calama, II Región de Antofagasta, Chile.
Project includes the construction of 2-3 floor buildings, with a total capacity of 776 beds.
Volumes: 145.000 HH 13.783 M2
Location: I Región, Tarapacá
Volumes: 144.635 HH 7.968 M2
Location: II Región, Antofagasta
This EPC contract consists of the Engineering, Manufacturing, Transportation, Construction and Assembly, and Commissioning of all belt installations and site urbanization, as defined by the following:
Volumes: 1.518 m2 | 58.661 HH
Location: IV Región, 45 km de Salamanca
Works conducted from site preparation to construction and assembly of buildings and their respective connections. Project scope includes:
Location: V Región, Los Andes
Work details of the administrative building include:
Volumes: 22.500 HH 691 M2
Location: IV Región, Salamanca
This project’s objective was the development of all works and activities necessary to the rehabilitation, repair, testing and commissioning of the 4 existing camp buildings.
Location: I Región, Tarapacá
Project scope for Montec S.A. for the Codelco Chuquicamata division of the Tranque Talabre project includes:
Volumes: 1.040 m2 | 16.500 HH
Location: II Región, Antofagasta
Promet was responsible for the development, construction, and rental of 1 3-floor camp building, with: 99 30 m2 rooms equipped with private bathrooms, and a configuration of 198 beds between 66 rooms; and 66 beds in 33 rooms. The contract also includes all the works and supply necessary to couple with the existing services in the sector:
Volumes: 39.128 HH
Location: II Región, Antofagasta
Contract developed in partnership with Tecnofast. This includes: supply, construction, and assembly of 8 dormitory buildings at workman standards. Project consisted of 3 stages, including:
Volumes: 96.435 HH – 20.474 M2
Location: Calama, II Región Antofagasta
Project consists of the expansion of site changing facilities to incorporate 200 additional workers (from 720-capacity already built to a total of 920-person capacity), including the supply and installation of 10 New Jersey type barriers.
Volumes: 3.900 HH – 252 M
Location: Calama, II Región Antofagasta
Promet was responsible for the development of detailed engineering for Zaldivar Mining Camp, defining the project’s final aspects and optimizing the current layout. Three construction options presented for evaluation as part of the business strategy once the engineering stage ended.
Volumes: 3.750 HH – 7.995 M2
Location: 175 km al sureste de la ciudad de Antofagasta, II Región.
This EPC project consists of the development of design services, supply, construction, assembly, and rental of the 4 cafeterias with a 240 and 42-person capacity; plus an office with a 100-person capacity.
Volumes: 41.768 HH – 2.486 M2
Location: Mejillones, II Región Antofagasta.
This EPC project consists of the engineering, manufacture, transportation, construction, assembly, and commissioning of all project installations and site urbanization, including the cafeteria, offices, changing facility, gatehouse, bathrooms.
Volumes: 64.708 HH – 4.012 M2
Location: La Negra, II Región Antofagasta, Chile.
Development of all works and activities necessary for the rehabilitation, repair, testing, and commissioning of the existing Verde Camp.
Volumes: 318.963 HH – 10.861 M2
Location: 240 kilómetros al sureste de la ciudad de Iquique, Chile.
Volumes: 11.700 HH – 615 M2
Location: Calama, II Región de Antofagasta, Chile.
Volúmenes: 230.415 HH – 7.108 M2
Ubicación: Calama, II Región de Antofagasta, Chile.
Volumes: 120.000 HH – 6.642 M2
Location: 250 km al Noreste de la ciudad de Antofagasta, Chile.