Construction of Quebrada Blanca Camp Project, Phase 2

  • Client: Teck I Bachtel
  • Date Initiated: 28/02/2018
  • Scope: 

The contract was awarded to a consortium of Promet/Technofast for construction for 4 camps for the Quebrada Blanca project Phase 2. This included: supply, construction & assembly and rental of camp dormitory buildings and auxiliary buildings, as well as urbanization works for sanitation and electrical, water treatment plant, supply and installation of tanks

Volumes: 1.256.772 HH – 99.4614
Location: Aprox, a 165 km al sureste de Iquique, I Región Tarapacá.

Chacay II Camp

Our company executed this EPC contract from the engineering, supply, construction, assembly, to testing and all construction activities for the Chacay II Camp, which has a 1.550 person capacity. Project scope includes:

  • – Dormitory buildings (standards: management, supervisor, and worker).
  • – Cafeterias with kitchens for reheating
  • – Recreation rooms, administration, control, and first aid facilities
  • – Treatment plants for potable water and wastewater
  • – Electrical distribution network
  • – Urbanization for all buildings and installations


Volumes:
20.485 m2 | 574.599 HH
Location: IV Región, 45 km de Salamanca

EPC Industrial Sector for Surface and Interior Mine, North Side

This project consists of the construction and assembly of the mining surface and underground infrastructure (Industrial sector for the surface and mine interior) with an EPC modality, including stages of: detailed engineering, construction/assembly, and commissioning. This contract was completed thanks to the synergy and know-how of our Modular E+C and Industrial Construction business units, which allowed us to complete the “Dining-Refuge Industrial Crushing-BICH Area” project. Thanks to this, our Mine Infrastructure proposal can host from a minimum of 400 people to a peak of 1,200, with main areas such as dining area, offices, control rooms, and workshops, among others; developed in the mine’s interior as well as on the surface.

Volumes: 473.438 HH
Location: II Región, Antofagasta

Ver proyecto en 360º

Codelco Gaby Camp

  • Client: Codelco Gabriela Mistral
  • Date Initiated: 31/01/2018
  • Scope:

This EPC project consists of the development of design, architecture, detailed engineering, construction and assembly services for the project called “Supply, Construction, and Construction for DGM Camp Operations”, composed of dormitory buildings, as well as the complementary infrastructure for recreation and parking areas for personal transport.

Volumes: 78.533 HH
Location: 120 km al sur de Calama, II Región de Antofagasta, Chile.

Ver Proyecto en 360º

QB II Camp Expansion

Project includes the construction of 2-3 floor buildings, with a total capacity of 776 beds.

Volumes: 145.000 HH 13.783 M2
Location: I Región, Tarapacá

Zaldivar Phase II Camp

  • Client: Compañía Minera Zaldivar
  • Date Initiated: 15/07/2020
  • Location: II Región, Antofagasta
  • Scope:

  • – 4 dormitory buildings
  • – Cafeteria/kitchen
  • – Comedor de terreno
  • – Gym
  • – AMSA office building
  • – Fire prevention network
  • – Construction of tank and potable water network, wastewater and water treatment plant
  • – Construction of refurbished modular polyclinic
  • – General electrical system, electrical distribution network; construction of capacitor bank


Volumes:
144.635 HH 7.968 M2
Location: II Región, Antofagasta

Construction of COM New Refuge

  • Client: Minera Los Pelambres
  • Date Initiated: 07/01/2019
  • Location: IV Región, 45 km de Salamanca
  • Scope:

This EPC contract consists of the Engineering, Manufacturing, Transportation, Construction and Assembly, and Commissioning of all belt installations and site urbanization, as defined by the following:

  • – A new modular refuge with 84 rooms distributed in 3 floors (28 double rooms per floor with shared bathroom for each pair; 168 beds total).
  • – One modular recreation room one story in height.
  • – Covered walkways are considered for access to other installations, with FRP PV6 2 meter siding, with natural and artificial illumination.


Volumes:
1.518 m2 | 58.661 HH
Location: IV Región, 45 km de Salamanca

Saladillo Camp

Works conducted from site preparation to construction and assembly of buildings and their respective connections. Project scope includes:

  • 168 rooms in 3 buildings, under rental modality for a period of 6 months.


Location:
V Región, Los Andes

EPC Desalination Administrative Building

  • Client: Minera Los Pelambres
  • Date Initiated: 15/09/2020
  • Location: IV Región, Salamanca
  • Scope:

Work details of the administrative building include:

  • – Development of engineering, architecture, structural, electrical, climate control, and sanitation design.
  • – Manufacture of modules and elements necessary for construction and assembly of the building.
  • – Module interior finishes
  • – Functional warehouse design
  • – Supply, installation and certification of warehouse equipment


Volumes:
22.500 HH 691 M2
Location: IV Región, Salamanca

Collahuasi Camp Rehabilitation

  • Client: Minera Doña Inés de Collahuasi
  • Date Initiated: 5/10/2020
  • Location: I Región, Tarapacá
  • Scope:

This project’s objective was the development of all works and activities necessary to the rehabilitation, repair, testing and commissioning of the 4 existing camp buildings.

Location: I Región, Tarapacá

Talabre Projet Offices

Project scope for Montec S.A. for the Codelco Chuquicamata division of the Tranque Talabre project includes:

  • – Office building
  • – Exterior bathrooms
  • – Construction & assembly of modules
  • – Engineering


Volumes:
1.040 m2 | 16.500 HH
Location: II Región, Antofagasta

Enablement of Pionero Camp

Promet was responsible for the development, construction, and rental of 1 3-floor camp building, with: 99 30 m2 rooms equipped with private bathrooms, and a configuration of 198 beds between 66 rooms; and 66 beds in 33 rooms. The contract also includes all the works and supply necessary to couple with the existing services in the sector:

  • – Plumbing system
  • – Fire prevention system
  • – Electrical system
  • – Potable water system


Volumes:
39.128 HH
Location: II Región, Antofagasta

RT Camp | 2018 Ampliation VP North Zone

  • Client: Codelco RT
  • Date Initiated: 17/07/2018
  • Scope:

Contract developed in partnership with Tecnofast. This includes: supply, construction, and assembly of 8 dormitory buildings at workman standards. Project consisted of 3 stages, including:

  1. 1. 512 beds (ready Sept 30 2018)
  2. 2. 512 beds (ready Oct 30 2018)
  3. 3. Rental of 500 beds starting Jan 1 2019, in Promet’s Calama hotel. (Promet)


Volumes:
96.435 HH – 20.474 M2
Location: Calama, II Región Antofagasta

Expansion of Acid Plant Changing Facilities

  • Client: SNC Lavalin
  • Date Initiated: 22/06/2018
  • Scope:

Project consists of the expansion of site changing facilities to incorporate 200 additional workers (from 720-capacity already built to a total of 920-person capacity), including the supply and installation of 10 New Jersey type barriers.

Volumes: 3.900 HH – 252 M
Location: Calama, II Región Antofagasta

Detailled Engineering of Zaldivar Mining Camp

  • Client: Minera Zaldivar
  • Date Initiated: 28/05/2018
  • Scope:

Promet was responsible for the development of detailed engineering for Zaldivar Mining Camp, defining the project’s final aspects and optimizing the current layout. Three construction options presented for evaluation as part of the business strategy once the engineering stage ended.

Volumes: 3.750 HH – 7.995 M2
Location: 175 km al sureste de la ciudad de Antofagasta, II Región.

Construction and Rental of temporary installations (TCF and Mobile Cafeterias)

  • Client: Saipem
  • Date Initiated: 10/04/2018
  • Scope:

This EPC project consists of the development of design services, supply, construction, assembly, and rental of the 4 cafeterias with a 240 and 42-person capacity; plus an office with a 100-person capacity.

Volumes: 41.768 HH – 2.486 M2
Location: Mejillones, II Región Antofagasta.

Capricornio Project Modular Buildings for Project Installation

  • Client: Amec Foster Wheeler | Rockwood Lithium
  • Date Initiated: 09/06/2017
  • Scope:

This EPC project consists of the engineering, manufacture, transportation, construction, assembly, and commissioning of all project installations and site urbanization, including the cafeteria, offices, changing facility, gatehouse, bathrooms.

Volumes: 64.708 HH – 4.012 M2
Location: La Negra, II Región Antofagasta, Chile.

Verde Camp Rehabilitation and Commissioning

  • Client: Teck Minera Quebrada Blanca| Bechtel
  • Date Initiated: 11/08/2017
  • Scope:

Development of all works and activities necessary for the rehabilitation, repair, testing, and commissioning of the existing Verde Camp.

Volumes: 318.963 HH – 10.861 M2
Location: 240 kilómetros al sureste de la ciudad de Iquique, Chile.

Ver Proyecto en 360º

Modular Buildings for Changing Facility and Offices

  • Client: Codelco Chuquicamata
  • Date Initiated: 15/08/2017
  • Scope:

    Changing facility and office buildings, including bathrooms, cafeteria and kitchen, modular gatehouses.


Volumes:
11.700 HH – 615 M2
Location: Calama, II Región de Antofagasta, Chile.

EPC Ampliación y Mejoramientos Oficinas Plataforma VP

  • Cliente:  Codelco VP
  • Fecha Inicio:  16/11/2016
  • Alcances:

  • – Remodelación y Construcción de Oficinas VP, auditorio, policlínico, casa de cambio y paisajismo.
  • – Sala de control, Edificio HSE, Urbanización, Edificios Garita de Control.


Volúmenes:
 230.415 HH – 7.108 M2
Ubicación: Calama, II Región de Antofagasta, Chile.

Modular Buildings for Site Installations Codelco Chuquicamata

  • Client:  Zublin
  • Date Initiated:  21/07/2016
  • Scope:

  • – -Supply, construction, and assembly of warehouses on site surface. (Materials warehouse, mechanical workshops, welding, additives, wash room, storeroom for lubricants and gasses).
  • – Supply, construction, and assembly of offices in installation of project surface. (Changing facility office, cafeteria, and laboratory.)


Volumes:
 120.000 HH – 6.642 M2
Location: 250 km al Noreste de la ciudad de Antofagasta, Chile.

Hotel Coya Camp

  • Camp: Hotel Coya.
  • Client: Promet
  • Date: 2015
  • Capacity: 2.048
  • Cafeteria: 6.150 Servicios
  • Number of buildings: 24
  • Location: Región VI, Chile.

Hotel Mejillones Camp

  • Camp: Hotel Coya.
  • Client: Promet
  • Date: 2015
  • Capacity: 1.792
  • Cafeteria: 6.00 Servicios
  • Number of buildings: 16
  • Location: Región II, Chile.

Minera Antucoya Camp

  • Camp: Minera Antucaya
  • Client: Minera Antucaya / SNC Lavalin
  • Date: 2013
  • Capacity: 5.576
  • Camp Area: 57.106 M2
  • Number of buildings: 57
  • Location: Región II, Chile.

Codelco Ministro Hales Cafeteria

  • Cafeteria: Casino Codelco Ministro Hales
  • Client: Codelco MMH
  • Date: 2012
  • Location: Región II, Chile.

Hotel Calama Camp

  • Camp: Hotel Calama
  • Client: Promet
  • Date: 2010
  • Capacity: 740
  • Cafeteria: 8.000 Servicios
  • Number of buildings: 19
  • Location: Región II, Chile.

Hotel Huechun Camp

  • Camp: Hotel Huechún
  • Client: Promet
  • Date: 2010
  • Capacity: 640
  • Cafeteria: 2.000 Servicios
  • Number of buildings: 8
  • Location: Región RM, Chile.

Los Bronces Camp

  • Camp: Los Bronces
  • Client: Anglo American / Bechtel
  • Date: 2010
  • Location: Región RM, Chile.

Del Inca Pavillion Camp

  • Camp: Pabellón del Inca
  • Client: Collahuasi
  • Date: 2008
  • Camp Area: 3.685 M2
  • Location: Región I, Chile.

Esperanza Mining Company Camp

  • Camp: Minera Esperanza
  • Client: Minera Esperanza / Bechtel
  • Date: 2008
  • Camp Area: 37.204 M2
  • Cafeteria
  • Location: Región II, Chile.

Perez Caldera Camp

  • Camp: Perez Caldera
  • Client: Anglo American / Bechtel
  • Data: 2010
  • Camp Area: 5.405 M2
  • Location: Región RM, Chile.

Michilla Dock Temporary Camp

  • Camp: Campamento Temporal Muelle Michilla
  • Client: Minera Esperanza
  • Date: 2009
  • Camp Area: 9.455 M2
  • Cafeteria
  • Location: Región VI, Chile.

Rio Blanco Tunnel Diversion Camp

  • Camp: Campamento Túnel Desvío Rio Blanco
  • Client: Codelco Andina
  • Date: 2008
  • Area: 704 M2
  • Location: Región RM, Chile.

Codelco Saladillo Offices

  • Offices: Codelco Saladillo
  • Client: Codelco Andina
  • Date: 2008
  • Area: 1.570 M2
  • Location: Región RM, Chile.

Camp + Control Room

  • Camp: Campamento + Sala de Control
  • Client: Codelco Andina / SKM Minmetal
  • Date: 2007
  • Area: 2.365 M2
  • Location: Región RM, Chile.

El Tesoro Camp

  • Camp: Campamento El Tesoro
  • Client: Minera El Tesoro
  • Date: 2008
  • Area: 1.722 M2
  • Location: Región II, Chile

Peldehue Anglo Camp

  • Camp: Campamento Peldehue
  • Client: Anglo American Bechtel
  • Date: 2010
  • Area: 2.159 M2
  • Location: Región RM, Chile.

Codelco Gaby Camp

  • Camp: Campamento Codelco Gaby
  • Client: Codelco Gaby
  • Date: 2006
  • Area: 32.620 M2
  • Location: Región II, Chile.

Riochilex Camp

  • Camp: Campamento Riochilex
  • Client: Minera Riochilex / Spence
  • Date: 2004
  • Area: 41.166 M2
  • Location: Región II, Chile.

Caserones Camp

  • Camp: Campamento Caserones
  • Client: Minera Lumina Cooper / Fluor
  • Date: 2011
  • Area: 7.236 M2
  • Location: Región III, Chile.

Sierra Gorda Camp

  • Camp: Campamento Sierra Gorda
  • Client: Sierra Gorda SCM
  • Date: 2011
  • Area: 41.824 M2
  • Location: Región II, Chile.

Escondida Mine 5400 Camp

  • Camp: Campamento 5400 MEL
  • Client: BHP Billiton
  • Date: 2011
  • Area: 12.000 M2
  • Location: Región II, Chile.